-
321
Chute Allard and Rapides-des-Coeur Generating stations
Project name :
Chute Allard and Rapides-des-Coeur Generating stations
Client :
Hydro-Québec
Location :
St. Maurice River, QC, Canada
Chute Allard and Rapides-des-Coeur Generating Stations
Our team has worked with Hydro-Québec on this project in many ways. First, we performed impact assessments prior to construction authorization and a sectoral study of the bank geomorphology and dynamics created by future developments. Later, we provided detailed engineering of the ancillary services for the facilities. This included preparing equipment design notes and detailed working drawings for auxiliary electrical and mechanical systems.
-
346
Shawinigan Dam Complex
Project name :
Shawinigan Dam Complex
Client :
Hydro-Québec
Location :
Shawinigan, QC, Canada
Shawinigan Dam Complex
Due to the age of this facility (originally commissioned in 1914), Hydro-Québec decided to upgrade the plant. The complex has eight turbine-alternator groups, and our team was contracted to conduct preliminary project studies and provide detailed engineering services covering most aspects of the plant. This included design and production of drawings and specs for the supply, installation and construction of equipment and systems, managing engineering works and coordination with sub-contractors and between different specialties and manufacturers.